St. Louis Development Corporation (SLDC)
SLDC
St. Louis Development
City of St. Louis



Hyde Park Redevelopment

The documents below pertain to ongoing efforts to revitalize the Hyde Park Neighborhood. Each document has a date of origin or its latest revision date. For further information, contact Susan Taylor, Special Projects Manager, St. Louis Development Corporation, taylors@stlouismissouri.com or 314/259-3436.

NB: DISCLAIMER
THE DOCUMENTS ON THIS WEBSITE ARE FOR DISCUSSION PURPOSES ONLY The St. Louis Development Corp. (SLDC) does not warrant or represent the conditions described in any of the following documents as accurate, currently or historically; the actual condition of the area may differ dramatically from those described. Visitors to this website should verify actual conditions for themselves and waive and release SLDC, the City of St. Louis, the Land Clearance for Redevelopment Authority, the Land Reutilization Authority, the authors, and source of each document (and their respective employees, officers, commissioners, officials, directors, agents, contractors, subcontractors) from any and all claims and liabilities, judgments, expenses, debts, etc. arising out of or relating to, directly or indirectly, any inaccuracy of the documents. This waiver and release may be enforced by any of the above-mentioned persons as third-party beneficiaries.

- BREMEN THEATER, Bremen & N. 20th St.

- CONTACT INFORMATION (from meeting sign-in sheets)

- MEETING MINUTES

- HYDE PARK GATES/MONUMENTS, options & locations

- HYDE PARK MASTER PLAN (for park itself)
    EXISTING CONDITIONS
    PROPOSED IMPROVEMENTS: brochure
    PROPOSED IMPROVEMENTS: poster

- MAPS AND PHOTOS
   AERIAL PHOTO looking south
   AERIAL PHOTO looking east
   BIKEWAYS AND GREEN TRAILS
   CHAPTERS 99 AND 100 REDEVELOPMENT AREA PARCELS
   HYDE PARK NON-RESIDENTIAL PARCELS
   LRA PARCELS
   RECENT AND PROPOSED DEVELOPMENT (per latest developers mtg)
   TOPOGRAPHICAL MAP OF HYDE PARK IN 1933

- METROPOLITAN SEWER DISTRICT: instructions

- PLANNING & URBAN DESIGN: Hyde Park Improvements

- SALISBURY STREET ENHANCEMENT (BPS, OATES ASSOC. ENG.)
   
Terry Steinkoetter, Project Manager, BPS (314/641-8379)
    MEETING MINUTES
    PHASE I
    PHASE II
    ENTRY MARKER LOCATIONS
- TURNER HALL, 19TH AND SALISBURY
    PHOTO, southwest corner
    PHOTO, west facade


This Page Last Modified: 01/16/09